Step 1: Phone us on 01981 241 399 and have a chat. We can talk through your ideas and generally get a feeling for how feasible they are.
Step 2: We'll send you some literature on our products (or download here).
Step 3: We'll also send you a self-survey form (or download here).
Step 4: You fill out the self-survey form and return it to us - we just need some basic information about your proposed turbine site, what sort of obstructions might be near the turbine and how much electricity your property uses. The more information you can provide the better.
Step 5: Assuming your property is suitable we will come and do a full survey for you, for free.
Step 6: At this point you can talk through any issues or concerns that you have and ask about anything you are still unclear about.
Step 7: Based on the survey, we will send you a quote for the turbine you would like to install.
Step 8: You place an order by sending us a deposit cheque for 25% of the installation cost and we arrange a date for installation.
Step 9: The installation is done in two phases. First the concrete foundations are cast, we arrange the contractor and supervise this. Secondly, a few weeks later when the concrete has cured, we install the wind turbine and connect it to the national grid.
Step 10: You start generating your own electricity from the wind.
Step 11: We provide all the operating manuals and building regulation documentation.
Step 12: We invoice you for the final 75% of the project cost.